Realizations
  • Colmar Berg - Luxemburg
  • 5 months
  • 6800 m³

Mounting of silos seed center

  • Theeuwes – Ulicoten – Netherlands
  • 4 months

Mounting of steel construction and bulk silos feedmill plant

  • Kyleakin, Isle of Skye United Kingdom (Scotland)
  • 10 month

Installation of steel structures and silos fish feed plant

  • Spelle - Germany
  • 10 weeks

Mounting bulksilo of feedmill plant

  • Bretherton - Leyland / GB
  • 5 months
  • 18 600 m³

Mouting of silo Pet Food plant

  • Stradunia
  • 3 weeks
  • 450 m³

Mounting of flour and brans silo

  • Dobrzelin
  • 4 weeks
  • 13 t/h

Mounting of corn dryer LAW type LAW13SBC

  • Białystok / PL
  • 5 months

The modernization works in feed mill plant

  • Tielt / BE
  • 8 weeks

 Mounting of steel construction and silos plant organic fertilizers

  • Hengelo / NL
  • 12 weeks
  • 14 720 m³

Mounting of bulk silo.

  • Brande / Dania
  • 4 weeks
  • 900 m³

 Mouting bulk silo of  fish feed factory.

  • Pointe Noire – Kongo Brazzaville
  • 6 weeks

 

GMK Congo - Supervision of erection of steel construction and a silo for flour and brans

  • Aleksandrów / PL
  • 6 weeks
  • Capacity 12 t/h

 

Mounting of small feed mill plant 12t/h and transport equipment

  • Budyń / PL
  • 8 weeks
  • Capacity 25 t/h

Montage of maize dryer Stela MBD-XN 3-15 SB

  • Aleksandrów / PL
  • 9 weeks
  • Capacity 8 t/h

Mounting of maize dryer Stela

  • Budyń / Poland
  • 6 weeks
  • Capacity 16 t/h

Demontage of maize dryer

  • Koronowo / Poland
  • 8 weeks
  • Capacity 22 t/h

Mounting of maize dryer LAW type SBC 24 LE

  • Podkonice Duże / PL
  • 6 months
  • Capacity 7550 m3

Mouting of steel construction a new feed mill plant Golpasz

  • Aarhus / Denmark
  • 7 months
  • Capacity 30 t/h

Finishing works, in the construction of ATR feed mills in Denmark

  • Mchy / Poland
  • 8 weeks
  • Capacity 8 t/h

Mounting of maize dryer STELA typ MBD-TN 1/8 SU

  • Bullingen / Belgium
  • 10 weeks
  • Capacity 500 m3

Mouting bulk silo of feedmill factory

  • Aarhus / Danmark
  • 6 months
  • Capacity 6600 m3

Mouting dosing and bulk silo of feedmill factory.

  • Cerkwica Duża / PL
  • 5 months
  • Capacity 1350 m3

Mouting of flour and bran silo.

  • Bleiswijk / Holand
  • 4 months
  • Capacity 3800 m3

Mouting of dosing silo.

  • Łomża / Poland
  • 3 months
  • Area 2150 m3

Mounting of elevation the new dosing silo and dismantling storage silo

  • Trzebiechów / PL
  • 11 weeks
  • Capacity 11 t/h

Mounting of maize dryer STELA typ MBD-XN 1/10 SB Biturbo

  • Morąg / Poland
  • 12 weeks
  • Capacity 12 t/h

Mounting of maize dryer Stral FRT 7000 6

  • Łomża / Poland
  • 4 months
  • Capacity 4650 m3

Mouting steel construction and dosing silo of feedmill factory with a capacity of 4500 m3

  • Grodzisk Wlkp. / PL
  • 4 months
  • Capacity 14 t/h

Mounting of maize dryer

  • Lasocice / Poland
  • 12 weeks

Mounting of isolation transport equipment and silo hopper

  • Zasiadki / Poland
  • 11 weeks
  • 400 t

Installation of grain silo 4 x 100 t and transport equipment

  • Grabki Duże / PL
  • 8 weeks

Mounting of slide gate dosing and weights part of newly built feed mill plant.

  • Ząbkowice Śl. / PL
  • 4 months
  • Capacity 65 t/h

Mounting of maize dryer capacity 65 t / h

  • Oborniki Wlkp. / PL
  • 9 weeks

Mounting of seed cleaners

  • Keratsini / Greece
  • 12 weeks
  • Capacity 800 m3

Mounting of silos for bran and flour

  • Jevisovice / CZ
  • 6 months
  • Capacity 15 t/h

Dismantling of complete feed mills factory and the relocation of the plant to the Poland.

  • Lasocice / Poland
  • 12 weeks
  • Capacity 850 t

Installation of daily silo 850t and transport equipment

  • Iłowo Osada / PL
  • 7 months
  • Area 1300 m3

Renovation of elevation a grain storage silo

  • Keratsini / Greece
  • 5 months

Installation of mill equipment- flourmill 300 t/24h

  • Dobrzelin / Poland
  • 13 weeks

Installation of trasport equipment bulk storage silos feed mill factory

  • Dobrzelin / Polen
  • 10 weeks
  • Capacity 15 t/h

Installation pelleting line 15 t/h in the feedmiil factory

  • Grabki Duże / Polen
  • 3 months
  • Capacity 4500 t

Mounting of storage silos- 6 x 760 t

  • Świnoujście / Polen
  • 5 months
  • 500 t/h

Assembly of transport equipment in Świnoujście Seaport.

  • Spytkowice / PL
  • 11 weeks
  • Capacity 2300 m3

Mounting steel construction and bulk storage silos feed meel factory

  • Goświnowice / PL
  • 9 weeks

Assembly of transport equipment storage silos. Bioethanol production.

  • Lasocice / Poland
  • 4 months
  • Area 6600 m2

Mounting of the wall cladding

  • Lasocice / Poland
  • 7 months
  • Capacity 65 t/h

Assembly of equipment for the production of feed for laying hens

  • Lasocice / Poland
  • 5 months
  • Capacity 5800 m3

Mounting dosing silos and steel construction feedmeel factory 65 t/h.

  • Komarom / Hungary
  • 11 weeks
  • Capacity 2300 m3

Mounting of dosing and bulk storage silos. Maize oil production.

  • Stargard Sz. / PL
  • 12 weeks

Mounting of storage silos and transport equipment biofuels production- REM

  • Grabki Duże / PL
  • 9 weeks
  • Capacity 10 t/h

Mounting II line, pelleting line 10 t / h

  • Ravenstein / NL
  • 10 weeks

The exchange and assembly aspiration equipment of pelleting line.

  • Łęczyca / Poland
  • 2 weeks

Mounting of molasses tank. Fabrication and mounting operating platform.

  • Torhout / Belgium
  • 3 months
  • Capacity 18 t/h

Mounting maize drying (Stella) and transport equipment.

  • Łęczyca / Poland
  • 8 months
  • Capacity 40 t/h

Mounting of steel construction, silos and dosing equipment for the production of feed mill in tower technology. 40T/ h

  • Grabki Duże / PL
  • 5 months
  • Capacity 20 t/h

Mounting dosing silos and machinery in the production tower.

  • Dobrzelin / Poland
  • 11 months
  • Capacity 45 t/h

Steel structures, silos and elevation in feedmeel factory.

  • Lagos / Nigeria
  • 9 weeks
  • Capacity 1300 m3

Steel construction of the mill silos and elevation.

  • Waalwijk / NL
  • 10 weeks
  • Capacity 2100 m3

Mounting of steel construction and dosing silos.

  • Kortrijk / Belgium
  • 10 weeks
  • Capacity 2200 m3

Mounting of steel construction and bulk storage silos.

  • Kalisz / Poland
  • 12 weeks
  • Capacity 1080 m3

Mounting of steel construction and bulk storage silos.

  • Żywiec / Poland
  • 4 months
  • Capacity 12000 m3

Mounting of maltsilos (12 cells- capacity 9500m3)